Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

 


MECHANICAL ENGINEERING

Off-line Safety Valve pressure setting at TNB Paka Power Station (2010/2013)

Design, install and commission of piping work for GTE high pressure washing skid system for Compressor Washing at Panglima Power Sdn Bhd
Design, install and commission of piping work for GTE high pressure washing skid system for Compressor Washing at TNB Paka Power Station
On site machining for K3T-1401 Steam Turbine Casing for Petronas Amonia Sdn Bhd
Major overhauls and replace parts for Fire Water Pump Caterpillar Diesel engine for Petronas Dagangan Berhad
Fabricate new Shaft for Pump for Petronas Gas Bhd
Overhaul, dismantle & install pump at Kemaman Bitumen Company Sdn Bhd
Remove, Overhaul, Install & Commission Pump & Steam Turbine (P3-201B & PT3 201B) At Gas Processing Plant Complex A for Petronas Gas Berhad
Inspection,Servicing & Testing Of Sapag Pressure Relief Valve at Unit 2 during Major Overhaul. Stesen Janaelektrik Sultan Azlan Shah, Manjung Perak
To Perform Servicing For Six Units Of Intercoolers – for CUF Kerteh of Petronas Gas Berhad
To Fabricated P5 1002D Parts Of Pompe Pump at GPP Complex B for Petronas Gas Berhad
To Repair 2 Unit Oil Coolers For Solar Saturn at Pulai-A & Bekok-A For Petronas Carigali Berhad
To perform GT2A & GT2B Exhaust Duct Repair Work at TNB Paka Power Station



ELECTRICAL ENGINEERING
Motor maintenance (rewinding & services) for TNB Paka Power Station (2011/2012) (2012/2013)
Service Water Injection Pump Motor for Petronas Carigali Sdn Bhd
Repair & service HV explosion proof coil motor for Petronas Carigali Sdn Bhd
Service Alternator for Petronas Carigali Sdn Bhd
Pit Stop SD Protection Relay Testing for Asean Bintulu Fertilizer (ABF) Sdn Bhd



INSTRUMENTATION ENGINEERING

Rotating Equipment and Instrument Item for PETRONAS GAS BERHAD CUF GEBENG / KERTEH under REMACO
Calibration on Control Valve, Transmitter, Switches, RTD and Thermocouples for PETRONAS GAS BERHAD CUF GEBENG / KERTEH under REMACO
Vibration Monitoring System for PETRONAS GAS BERHAD CUF GEBENG / KERTEH under REMACO
Commissioning of Rotating Equipment and Field Instrument for PETRONAS GAS BERHAD CUF GEBENG / KERTEH under REMACO



MANPOWER SUPPLY

Battery & Lighting maintenance at TNB Paka Power Station (2007/2008) (2008/2009) (2009/2010) (2010/2011) (2011/2014)
Corrective maintenance on Roller Shutter at TNB Paka Power Station (2010/2011) (2011/2012) (2012/2013)
TNB’s quarters compound lighting maintenance (2010/2012) (2012/2013)
DOSH inspection preparation works for 12 blocks at TNB Paka Power Station (2010/2011)
DOSH inspection preparation works for 6 blocks at TNB Paka Power Station (2008/2009)
DOSH inspection preparation works for 3 blocks at TNB Paka Power Station (2007)
Maintenance Works at Petronas CUF Kerteh & Gebeng for Control & Instrumentation (C & I) (2012/2014)
Provision of Electrical Turnaround Inspection & Maintenance Services For Module 3/5/6/8 Turnaround for MLNG, Bintulu (2012-2014)
Repair & maintenance works for TNB and Non-TNB power plants in Peninsular Malaysia


CONDITION BASED MONITORING
Supply & Install of 71 sets of Qualitrol capacitive couplers (PD Tech system-CC7, CC15, CC20 & CC30) on generators at TNB & IPP Power Station (2006-2012)
Supply & Install of 9 sets of Qualitrol ATEX High Frequency Current Transformer (PD Tech System HFCT-CT85) on critical motors at TNB Power Station (2012-2013)
Supply & Install of 7 sets of Qualitrol capacitive couplers (PD Tech system-CC7) on critical motors at TNB Power Station (2012-2013)
EMI Diagnostic Testing at various TNB’s Power Station, IPP’s Power Station, Petronas on-shore and off-shore platforms, around 300 tests being performed during 2009-2012.



CONTRACT WORK
The Development of Small Hydro Plant Under The Small Renewable Energy Power Programme At Sg. Brooke, Gua Musang, Kelantan (2010-2013)
Supply, Erect And Commissioning of 132kV & 33kV Switchgear, Transformer & Ancillary Equipment Complete With Associated Civil Works for PMU 132/33kV Senai Extension (2 x 90MVA) for TNB (2012-2013)
Proposed Design, Upgrading, Testing & Commissioning of Existing Sub-Station & Other Associated Works At Main Terminal Building, KLIA (2012-2013)